01When to use the site engineer job description, and who uses it
A project manager at a contractor writes this description when they need an engineer on site every day: a residential building, a warehouse, infrastructure works or a renovation. HR uses it in the contract and to verify professional membership with the Saudi Council of Engineers, and the manager reviews the engineer on conformity of work, quality of acceptance and keeping to the schedule.
It is reopened when the engineer moves from civil to MEP work, when they are given more than one site, or when the job is given authority to approve subcontractors' progress claims instead of recommending them.
02The site engineer job description
Copy the whole text, then delete what does not apply; the site engineer's duties fall into 5 groups: Supervising execution, Quality and acceptance, Quantities and schedule, Site safety and Reports and records.
[Company name] Job Description Job title: Site Engineer Department: Projects / Site Reports to: Project Manager Work location: [project site] Work pattern: [full-time / by the work-period schedule] Issue date: [date] Version: [number] Job summary The site engineer supervises execution to the drawings and specifications, follows contractors and workers, watches quality, quantities and the schedule, and reports progress and problems to the project manager. Duties and responsibilities 1) Supervising execution - Match executed work with the approved drawings and specifications. - Direct foremen and contractors on what must be done each day. - Report any gap between the drawing and reality and suggest how to deal with it. 2) Quality and acceptance - Check incoming materials and ask for the test results needed. - Inspect completed work before approval and acceptance. - Record remarks and follow up their correction. 3) Quantities and schedule - Measure executed quantities and prepare contractor claims for review. - Follow the programme and report causes of delay. - Order materials on time with purchasing. 4) Site safety - Enforce protective equipment and safety procedures. - Inspect scaffolds, excavations and equipment before use. - Tell the safety officer and project management of any incident or breach. 5) Reports and records - File the daily and weekly progress report with photos. - Keep the approved drawings, approval requests and meeting minutes. - Attend site meetings with contractors and consultants. Suggested performance indicators - Executed work matching drawings and specifications. - Keeping to the project programme. - Number of open remarks and speed in closing them. - Accuracy of quantity measurement and claim review. - Completeness of daily reports and photos. Qualifications and experience - Bachelor degree in civil or architectural engineering or what the project needs. - At least [__] years supervising execution [if required]. - Good command of drawing and scheduling software. Skills required - Reading drawings and specifications. - Measuring quantities. - Managing contractors and workers. - Writing technical reports. - Solving site problems quickly. Working conditions - Work location: the project site [site], outdoors most of the time. - Hazards: working near machinery, at height and around excavations. - Work pattern: [full-time], with project-specific hours at times. Approval [Approver name and job title] Signature: ________ Date: [date] Job holder acknowledgment I have read the site engineer description above and confirm I understand its duties. Name: [employee name] Signature: ________ Date: [date]
03The site engineer description, clause by clause
Supervising execution: the latest approved drawing
The engineer checks the work against the latest approved drawings and specifications, directs foremen and subcontractors, and raises conflicts with the consultant. Building from an old revision is what costs most in rework.
Quality and acceptance: an inspection request before closing up
The engineer accepts each stage before it is covered, asks for the consultant's inspection where required, and records the acceptance. Reinforcement with concrete poured over it can no longer be inspected.
Quantities and schedule: done against planned
The engineer measures completed quantities, compares them with the schedule, and raises delays and their causes early. Authority over progress claims is written: approve or recommend.
Site safety: a shared responsibility
The engineer follows the safety plan and works with the safety officer, never ordering work that breaches it for the sake of the schedule. Authority to stop hazardous work sits with the safety officer and the engineer together, as the company writes it.
Reports, records and qualifications
Daily and weekly reports on progress, labour, equipment and problems, and a log of instructions and correspondence. The qualification is an engineering degree in the discipline, current professional membership and experience on similar projects.
Approval at the end of the template
The site engineer description ends with the approver's name, title, signature and date, so when duties change a new version is issued with a new number instead of handwritten edits.
04Interview questions that test the site engineer description
- 01You find a conflict between the structural and architectural drawings. What do you do? Stops the affected item, raises a formal query with the consultant, and does not improvise a solution.
- 02A subcontractor asks for acceptance of an unfinished stage. How do you respond? Refuses acceptance and records the remarks with a date for re-inspection.
- 03The project is two weeks behind. What do you give the project manager? The causes with figures, the critical path and a recovery plan with its cost.
05A filled-in example: a civil site engineer on a residential project in Riyadh
A contractor in Riyadh hires a non-Saudi civil site engineer reporting to the project manager for a six-building residential compound. The company wrote that current professional membership is required, that the engineer recommends progress claims and the project manager approves them, and that three site foremen report to the engineer on execution. As the engineer is not Saudi, nothing is deducted for GOSI, and the company estimated sixteen hours of overtime a month for concrete pours.
| Field | In the example |
|---|---|
| Company | A contractor building a residential compound |
| City | Riyadh |
| Work period | Morning, 6:30 am to 4:30 pm with an hour's break |
| Start date | 2026-12-06 |
| Nationality | Non-Saudi |
| Basic salary | SAR 11,000.00 |
| Housing allowance | SAR 2,750.00 |
| Transport allowance | SAR 1,100.00 |
| Total monthly salary | SAR 14,850.00 |
Entering these site engineer numbers in the overtime calculator, the leave calculator, the GOSI calculator and the end-of-service calculator returns the same results:
| Calculation | Result | Basis |
|---|---|---|
| End of probation (90 days) | 2027-03-05 | the start date counts as day one |
| Actual hourly wage | SAR 61.88 | (basic + allowances) ÷ 30 ÷ 8 hours |
| Overtime hourly rate | SAR 84.79 | actual hourly wage + 50% of the basic hourly wage |
| Pay for 16 overtime hours | SAR 1,356.67 | overtime rate × hours |
| Employee GOSI share per month | SAR 0.00 | nothing is deducted from a non-Saudi employee |
| Employer GOSI share per month | SAR 275.00 | 2% of the contributory wage |
| End-of-service award if the contract ends at term after two years | SAR 14,850.00 | half a month's wage per year for the first five years, on the total of SAR 14,850.00 to 2028-12-05 |
| Annual leave earned by the end of probation | 5.18 days | 21 days per year of service, pro rata |
06Hard cases and common mistakes in a site engineer description
The consultant rejects completed work
The engineer records the consultant's remark and reason, identifies who executed it, and reports the effect of rework on schedule and cost to the project manager.
The owner asks for a verbal change
No change is made without an approved written variation order, because a verbal change becomes a dispute at the final account.
A materials shortage stops work
The engineer tells procurement early when materials are needed, resequences work to reduce stoppage, and records the effect.
A worker is injured on site
The engineer follows the emergency plan with the safety officer, stops work in the area and records it. What follows the injury is governed by GOSI regulations.
Common mistake: An engineer managing worker attendance
Attendance and discipline belong to the site foreman; the engineer answers for the specification.
Common mistake: Unwritten authority over progress claims
Approving a claim means money; write whether the engineer approves or recommends.
07Steps to adapt the site engineer description to your company
- 1
State the project type
civil, mechanical and electrical, or refurbishment, since the duties change.
- 2
Write the authority over contractors
does the engineer approve claims or recommend them.
- 3
Set the number of sites
one site or several in a day.
- 4
Link it to the safety officer
make clear who may stop work when there is danger.
08Site engineer description checklist before approval
6 items
09Frequently asked questions
The engineer answers for technical conformity, quality and quantities, while the foreman runs the workers and the daily work among them.
Do not list it as a condition unless you confirm from an official source that your activity requires it; otherwise make it a plus.
It can, so write the sites and the weekly visits.
It is enough to state the nature of the work and the work pattern, and keep details in the work-period schedule.
Yes, to practise in Saudi Arabia; it is checked before starting and at renewal.
Usually, with office time for reports; write that under working conditions.
That depends on the contract; usually through the project manager and the consultant.
On the share of work accepted at first inspection, keeping to schedule, complete records and safety within their area.
Yes, after changing the clauses to electrical works, testing and commissioning.