When project sites change every month, you do not rebuild attendance from scratch. You create a site for each project with its geofence, assign each worker to the site of their project, and when they move you change the assignment, not the account or the device. Their attendance record stays continuous in one file, and the whole month flows into payroll.
What is the problem with sites that keep changing?
A fixed branch has its geofence drawn once. In contracting, a site ends and another begins, some workers move mid-month, and others work at two sites in the same week. If the assignment goes stale, one of two things happens: a worker who is genuinely at their new site has their punch rejected, or a worker is allowed to punch from a site they are no longer responsible for.
What are the steps when a new project starts?
1. Create the project site with its geofence
The administrator defines a site named after the project and draws the geofence on the map so it covers the work yard and the workers' entrance. The system verifies every punch against this geofence. The drawing steps are in the geofence setup guide.
2. Assign each worker a punch location
Each employee has a punch location: anywhere, one location, or several. Project workers are assigned to the project's site, and anyone who moves between two projects is assigned both. A supervisor who visits all the sites can be set to "anywhere", with visits tracked instead.
3. Import the workers in one batch
Importing employees from a spreadsheet shows the errors in each row before saving, so you do not key names in one by one at every project.
4. Set the work period
An employee can have more than one work period, and a period can cross midnight for night work. Weekly rest days and public holidays enter reports and payroll.
5. Bind the device
Each worker uses a phone bound to their account. Workers without a suitable phone can punch on a compatible fingerprint terminal at the site gate, and their attendance reaches the same record.
How does a worker move between two sites?
A move is a change of assignment, not a new account. The request goes in under the ready-made request type "change shift or location", follows the approval route the company defines, and once approved the punch location changes. Because the system rejects a punch at a site the worker is not yet assigned to, add the new site the day before they arrive.
| Situation | Action |
|---|---|
| A worker moves permanently to another project | Their punch location changes to the new project's site |
| A worker spends a week at each site | Assign both sites |
| A supervisor visits the sites | Punch location "anywhere" with visits tracked |
| A project has ended | Stop the site so no punch is accepted there |
From attendance to payroll
The month's attendance enters payroll pro rata, so a worker who moved mid-month has all their attendance counted in one file rather than two. Public holidays and weekly rest days enter reports and payroll, so they are not counted as absences. Before closing, review the daily, detailed and monthly attendance reports, then run payroll with its separate line items.
Checklist for the start of each project
- Create the site, draw its geofence and test a punch at both edges.
- Import the worker list and review row errors.
- Assign each worker to their site, and two sites for those who rotate.
- Keep device binding on, and prepare a fingerprint terminal for workers without a phone.
- Set the work period and break times before the first week.
- Decide who receives the silent-absence alert and the rejected-attempts alert.
- At the end of the project stop the site and move the workers to their next one.
Example: two projects in one month
A contractor has one project handing over on the 15th and a new one starting on the 16th. Twelve workers stay assigned to the first project's site until the 15th. On the 14th the administrator adds the new project's site and assigns the workers to it from the 16th, so nobody is rejected on the morning of the move. At month end, payroll collects each worker's attendance days at both sites without re-entering them. No phone is re-bound, because the account and the device did not change.
Attendance and payroll in TAC HR
TAC HR offers mobile punching with the geofence verified in the system, more than one location per employee, compatible fingerprint terminals for sites without phones, lateness, early departure and partial absence calculation, and then monthly payroll. See the attendance service, the payroll service and solutions for construction.
Frequently asked questions
Do I need a new account for the worker at each project?
No. The account and device stay the same, and only the punch location changes.
What if the site has poor internet?
No punch is recorded without internet, because the system verifies the location. For sites without good coverage, consider a compatible fingerprint terminal once its network connection is secured.
Does the supervisor see who is late to the site?
The manager receives the silent-absence alert, HR receives a morning summary at 7:00, and lateness shows in the daily attendance report.
Can I move a group of workers at once?
The request is made per employee with an approval route, and someone with the permission can submit it on the employee's behalf.
Is attendance counted against project cost?
Attendance recorded by site flows straight into monthly payroll, so you know each crew's hours on every project before payroll is approved.
