- Minimum thresholds at 100 employees, 2026
- Low Green 7.00%Medium Green 10.00%High Green 13.00%Platinum 50.63%
- Name in the guide
- تعدين مواد البناء
- English name
- Mining of building materials
- Place in the guide
- Annex 1, printed page 8
- Effect of size on the threshold
- The threshold rises in Platinum; it is fixed in Low Green, Medium Green and High Green (Low Green 7.00% at every size)
- Years
- The constants are the same in 2026, 2027 and 2028 (Low Green at 100 employees 7.00% in all three years)
01Where Building materials mining sits in Nitaqat 2026
Look up Building materials mining on page 8 of Annex 1 and you find four rows, one per band, each with an m and three yearly values of c.
Building-materials mining is a row of its own, separate from metal and non-metallic mining. Its curve constant is zero in Low, Medium and High Green, so those thresholds are 7%, 10% and 13% at any entity size; only Platinum moves with size, because its curve constant is 6.
In the guide's definition an entity represents every branch of the same economic activity owned by one establishment, so the rate is read across all its branches together. From 10 to 1000 employees, Low Green does not change from 7.00% to 7.00%, and Platinum rises by 27.63 points from 36.82% to 64.45%.
Features of the Building materials mining thresholds
- Curve constant m: 0 for Low Green, 0 for Medium Green, 0 for High Green, 6 for Platinum.
- Widest gap at 100 employees, from High Green to Platinum: 37.63 points.
- The closest two bands at 100 employees are Low Green and Medium Green, 3.00 points apart.
- Among the 41 activities at 50 employees, Building materials mining ranks 21 for Platinum and 40 for Low Green.
- No Building materials mining threshold moves with the year.
- Each threshold is above the one before it at any size.
02Minimum rates in Building materials mining by headcount
From 10 to 3000 employees, with the 2026 Building materials mining coefficients.
| Total employees | Low Green | Medium Green | High Green | Platinum |
|---|---|---|---|---|
| 10 | 7.00% | 10.00% | 13.00% | 36.82% |
| 20 | 7.00% | 10.00% | 13.00% | 40.97% |
| 50 | 7.00% | 10.00% | 13.00% | 46.47% |
| 100 | 7.00% | 10.00% | 13.00% | 50.63% |
| 250 | 7.00% | 10.00% | 13.00% | 56.13% |
| 500 | 7.00% | 10.00% | 13.00% | 60.29% |
| 1000 | 7.00% | 10.00% | 13.00% | 64.45% |
| 3000 | 7.00% | 10.00% | 13.00% | 71.04% |
Red in Building materials mining: below 7.00% at 50 employees, below 7.00% at 500, and below 7.00% at 3000.
The average across activities at 50 employees is 49.67% for Platinum and 27.71% for Low Green, and Building materials mining is 3.20 points below it for Platinum and 20.71 points below for Low Green. Its Platinum rank is 26 at 10 employees and 20 at 200.
A 100-employee Building materials mining entity leaves Red with 7 Saudi employees and needs 51 Saudi employees for Platinum.
Its two closest activities by thresholds are Cleaning and laundry and Essential goods and fuel: at 500 employees Low Green starts at 7.00% in Building materials mining and at 9.87% and 10.92% in those two, and Platinum is 60.29% against 22.00% and 33.49%.
03The Building materials mining equation and a worked example
The Building materials mining coefficients feed y = m × ln(x) + c, where x is total average headcount.
| Band | m | c 2026 | c 2027 | c 2028 |
|---|---|---|---|---|
| Low Green | 0 | 7 | 7 | 7 |
| Medium Green | 0 | 10 | 10 | 10 |
| High Green | 0 | 13 | 13 | 13 |
| Platinum | 6 | 23 | 23 | 23 |
Let us calculate a building materials quarry of 320 employees, 33 of them Saudi, in Building materials mining for 2026:
- 01Total headcount is 320, and its natural logarithm is 5.7683.
- 02Saudization rate: 33 of 320, or 10.31%.
- 030 × 5.7683 + 10 = 10.00% for Medium Green, and likewise Low Green 7.00%, High Green 13.00%, Platinum 57.61%.
- 04Comparison: 10.31% reaches the Medium Green threshold of 10.00% and below the High Green threshold of 13.00%, so the band is Medium Green.
- 05Saudis needed for the next band: 10. 43 of 330 = 13.03%, and the High Green threshold at 330 is 13.00%.
Here the one-step shortcut with 13.00% agrees with the full recalculation on 10, because the High Green threshold does not move between 320 and 330 employees; that is not guaranteed.
And a bigger entity: 230 employees, 13 of them Saudi = 5.65%. The thresholds at that size are 7.00%, 10.00%, 13.00% and 55.63%, so the band is Red, and Low Green follows after 4 more: 17 of 234 = 7.26% against 7.00%.
04Saudis needed in Building materials mining at each size
For each total, the fewest Saudis that meet each band in Building materials mining, counting every Saudi as one.
| Total employees | Low Green | Medium Green | High Green | Platinum |
|---|---|---|---|---|
| 8 | 1 | 1 | 2 | 3 |
| 25 | 2 | 3 | 4 | 11 |
| 60 | 5 | 6 | 8 | 29 |
| 90 | 7 | 9 | 12 | 45 |
| 250 | 18 | 25 | 33 | 141 |
| 750 | 53 | 75 | 98 | 471 |
| 3000 | 210 | 300 | 390 | 2132 |
Up to 61 employees a single Saudi lifts the entity from Medium Green to High Green in Building materials mining; beyond that size at least two are needed.
16 versus 15: in a Building materials mining entity of 220, that single person is the difference between Low Green (7.27%) and Red (6.82%); the line sits at 7.00%.
Replace or hire? 14 employees with 1 Saudi employee at the Low Green minimum (7.00%), and Medium Green at 10.00%: replacing 1 expatriate keeps the total at 14, or hiring 1 new Saudi gives 2 of 15, a rate of 13.33% against a threshold of 10.00%.
What if the size doubles? At 640 employees with the same 10.31%, the thresholds become 7.00%, 10.00%, 13.00% and 61.77%, and the band is Medium Green as before.
A calculation, not a certificate. The Building materials mining numbers above apply the annex equation; the band that counts for your entity appears on the ministry's platforms.
05Building materials mining workforce checklist
8 items
Eight checks for a building materials quarry; swap the example figures (33 Saudis, 287 expatriates) for your own.
06What trips up the Building materials mining calculation
- Which row does your entity read? The Building materials mining thresholds apply to an entity registered under "Mining of building materials", and the guide's pages do not explain how to pick a row for a multi-activity establishment.
- A fixed minimum. In Building materials mining the Low Green threshold stays at 7.00% however large the entity grows.
- One Saudi jumps two bands. At 11 employees, replacing one expatriate with a Saudi moves the entity from Low Green to High Green (1 then 2), and this happens at 15 sizes between 6 and 500 employees, the last being 30.
- Small means sensitive. A 10-employee Building materials mining entity needs at least 1 Saudi employee to leave Red, and 4 for Platinum.
- A GCC employee. The guide's definition of expatriate labour excludes GCC nationals, and how they are counted in the numerator is not mentioned.
- No weights in the guide. Counting a Saudi as more or less than one is not in its pages, so this page and the calculator count each Saudi as one.
- Equal is enough. Reaching 60.29% at 500 employees, with nothing to spare, means Platinum.
- Iqamas close to expiry. A Building materials mining entity of 250 employees below 7.00% cannot renew its workers' permits even with a month left on an iqama.
07Building materials mining inside TAC HR
These screens give you the inputs; the calculator and tables give you the threshold.
- "Saudization impact" card in Hiring analyticsfor a building materials quarry with 33 Saudis of 320, it would read 10.3% and preview 10.6% or 10.3% for the next hire.
- "Screening and AI" tab in the job editorthe effect of the vacancy on your rate while you write the posting.
- Optional "Nationality" column in the employee listwhere you count 33 and 287, as in the example, before entering them.
- "Social insurance" section in Payroll reportsa Saudi or non-Saudi label for each employee in the payroll month.
- Document expiry alerts60, 30 and 7 days before an iqama expires by default, ahead of the six-month renewal condition.
08Building materials mining after 2026
The Building materials mining coefficients do not change between 2026 and 2028; at 100 employees: 7.00%, 10.00%, 13.00% and 50.63% in every year.
With the same numbers (33 and 287), the band of a building materials quarry does not change between 2026 and 2028: Medium Green in all three years.
Choose Building materials mining and your year in the Nitaqat calculator, and the other activities in the Nitaqat index.
09Frequently asked questions
50 employees: 7.00% for Low Green and 46.47% for Platinum. 500 employees: 7.00% and 60.29%.
7 Saudi employees for Low Green, 9 for Medium, 12 for High and 45 for Platinum, in 2026.
At 50 employees: 21 of 41 for Platinum (46.47%) and 40 of 41 for Low Green (7.00%).
No. The Building materials mining constants are the same until 2028, so Low Green at 100 employees is 7.00% and Platinum 50.63% every year.
Cleaning and laundry (8.63), then Essential goods and fuel (8.75), then Energy and water (8.78); smaller means closer to Building materials mining.
90 employees at the Medium Green minimum (9): replacing 3 reaches 13.00%, or hiring 4 gives 13 of 94 (13.83%).
Yes, at 11 employees: going from 1 to 2 Saudis moves it from Low Green to High Green.
At 500 employees Building materials mining needs 7.00% for Low Green and 60.29% for Platinum; Cleaning and laundry needs 9.87% and 22.00%.
For Building materials mining at 500 employees, anything under 7.00%: permits frozen, no visas, no occupation changes, no services transferred in.
At 10.00% for 100 employees, the Medium Green line in Building materials mining; below it, Low Green keeps new visas suspended.
Choose "Mining of building materials" in the Nitaqat calculator and enter average Saudi and expatriate headcount; the official band is on the ministry's platforms.
Because m differs by band: 0 for Low Green, 0 for Medium Green, 0 for High Green, 6 for Platinum.