- Minimum thresholds at 100 employees, 2026
- Low Green 23.74%Medium Green 27.61%High Green 37.58%Platinum 50.63%
- Name in the guide
- تعدين المعادن الفلزية والأحجار الكريمة
- English name
- Mining of metal ores and precious stones
- Place in the guide
- Annex 1, printed page 8
- Effect of size on the threshold
- All four thresholds rise as the entity grows in Metal ore mining (Low Green 19.87% at 10 and 27.61% at 1000)
- Years
- The constants are the same in 2026, 2027 and 2028 (Low Green at 100 employees 23.74% in all three years)
01The Metal ore mining activity in the procedural guide
Printed page 8 of the guide's annex carries the Metal ore mining thresholds: four bands, a curve constant per band and a Saudization constant per band and year.
Mining has three rows in Annex 1: metal ores and precious stones, non-metallic and industrial minerals, and building materials. This row covers metal ores and precious stones only, so an entity registered in building-materials mining does not read its thresholds here.
What is compared with the threshold is a ratio of averages, not a headcount on one particular day: Saudis over Saudis and expatriates combined, as a percentage. Between a 10-employee and a 1000-employee entity, the Metal ore mining Low Green threshold rises by 7.74 points (19.87% then 27.61%), and Platinum rises by 27.63 points (36.82% then 64.45%).
Metal ore mining coefficients at a glance
- Values of m from the lowest band up: 1.68 for Low Green, 1.87 for Medium Green, 2.08 for High Green, 6 for Platinum.
- High Green and Platinum are furthest apart at 100 employees, 13.05 points.
- The closest two bands at 100 employees are Low Green and Medium Green, 3.87 points apart.
- Rank at 50 employees: 21 of 41 for Platinum and 22 of 41 for Low Green.
- All three years share one table.
- Two thresholds cross at very small sizes, up to 3 employees.
02Minimum rates in Metal ore mining by headcount
2026 thresholds for eight entity sizes in Metal ore mining.
| Total employees | Low Green | Medium Green | High Green | Platinum |
|---|---|---|---|---|
| 10 | 19.87% | 23.31% | 32.79% | 36.82% |
| 20 | 21.03% | 24.60% | 34.23% | 40.97% |
| 50 | 22.57% | 26.32% | 36.14% | 46.47% |
| 100 | 23.74% | 27.61% | 37.58% | 50.63% |
| 250 | 25.28% | 29.33% | 39.48% | 56.13% |
| 500 | 26.44% | 30.62% | 40.93% | 60.29% |
| 1000 | 27.61% | 31.92% | 42.37% | 64.45% |
| 3000 | 29.45% | 33.97% | 44.65% | 71.04% |
The way out of Red in Metal ore mining is 22.57% for fifty employees, 26.44% for five hundred and 29.45% for three thousand.
Measured against all 41 activities at 50 employees, the Metal ore mining Low Green threshold of 22.57% compares with an average of 27.71%, and its Platinum threshold of 46.47% with 49.67%.
At one hundred employees the Saudis needed in Metal ore mining step up band by band: 24, 28, 38 and 51.
Cafes and beverage shops and Postal activities, the closest two, have Low Green thresholds of 26.80% and 22.13% at 500 employees, and Platinum thresholds of 45.90% and 48.78%.
03From coefficients to band in Metal ore mining
The equation is the same for every activity, y = m × ln(x) + c; what sets Metal ore mining apart is its coefficients:
| Band | m | c 2026 | c 2027 | c 2028 |
|---|---|---|---|---|
| Low Green | 1.68 | 16 | 16 | 16 |
| Medium Green | 1.87 | 19 | 19 | 19 |
| High Green | 2.08 | 28 | 28 | 28 |
| Platinum | 6 | 23 | 23 | 23 |
Take a metal ore mining company in Metal ore mining with 14 Saudi employees and 54 expatriates, table year 2026:
- 01x = 14 + 54 = 68, and ln(68) = 4.2195.
- 02Saudization rate: 14 of 68, or 20.59%.
- 03Platinum threshold = 6 × 4.2195 + 23 = 48.32%; the others: Low Green 23.09%, Medium Green 26.89%, High Green 36.78%.
- 04Band: 20.59% is below the Low Green threshold of 23.09%, so the band is Red.
- 05Saudis needed for the next band: 3. 17 of 71 = 23.94%, and the Low Green threshold at 71 is 23.16%.
The shortcut with the old threshold (23.09%) gives the same 3 in this example, and the threshold at 71 is 23.16%; in other entities it can differ.
Same two functions at 520: 161 Saudis and 359 expatriates give 30.96% and Medium Green; adding 93 reaches High Green with 254 of 613 = 41.44%, where the threshold is 41.35%.
04Saudis needed in Metal ore mining at each size
Metal ore mining, 2026: minimum Saudi headcount per band for totals between 10 and 1500.
| Total employees | Low Green | Medium Green | High Green | Platinum |
|---|---|---|---|---|
| 10 | 2 | 3 | 4 | 4 |
| 18 | 4 | 5 | 7 | 8 |
| 40 | 9 | 11 | 15 | 19 |
| 120 | 29 | 34 | 46 | 63 |
| 300 | 77 | 89 | 120 | 172 |
| 1000 | 277 | 320 | 424 | 645 |
| 1500 | 425 | 491 | 649 | 1004 |
21 employees is the turning point in Metal ore mining: below it one Saudi bridges High Green and Platinum, above it two are needed.
On the edge of High Green: 320 employees including 128 Saudi employees, so the rate is 40.00% against a threshold of 40.00%. If an expatriate replaces one Saudi it drops to 39.69% and the entity falls to Medium Green.
Replace or hire? 10 employees with 2 Saudi employees at the Low Green minimum (19.87%), and Medium Green at 23.31%: replacing 1 expatriate keeps the total at 10, or hiring 1 new Saudi gives 3 of 11, a rate of 27.27% against a threshold of 23.48%.
What if the size doubles? At 136 employees with the same 20.59%, the thresholds become 24.25%, 28.19%, 38.22% and 52.48%, and the band is Red as before.
A calculation, not a certificate. The Metal ore mining numbers above apply the annex equation; the band that counts for your entity appears on the ministry's platforms.
05Metal ore mining workforce checklist
8 items
Run these before a Metal ore mining offer letter or termination goes out.
06What trips up the Metal ore mining calculation
- Two branches in two cities. Two branches of a metal ore mining company in the same activity are one entity under the guide's definition, so the threshold is read at their combined 68 employees in the example.
- The threshold follows size. A Metal ore mining entity growing from 40 to 200 employees faces a minimum of 24.90% instead of 22.20%.
- 12 sizes with a double jump. Between 6 and 24 employees in Metal ore mining there are sizes where one Saudi lifts the entity two bands, the first being 6: from Red to High Green.
- Very small entities. Up to 3 employees, one band's threshold sits above the next, and the band is the last threshold the rate reaches, as in the guide.
- Ten employees. 2 needed for Low Green and 4 for Platinum, and one departure costs 10 points.
- A Gulf national in Metal ore mining. Not in the expatriate column, while counting them as Saudi appears neither in the definitions nor in the equation.
- 14 Saudis = 14. In the Metal ore mining example no employee is multiplied by a weight, because the 2026 procedural guide does not mention weights.
- Equal to the threshold. A rate equal to a threshold enters the higher band; exactly 27.61% at 100 employees is Medium Green.
- Iqamas close to expiry. A Metal ore mining entity of 300 employees below 25.58% cannot renew its workers' permits even with a month left on an iqama.
07Metal ore mining inside TAC HR
The numbers for a metal ore mining company in the example would, in practice, come from these screens rather than an estimate.
- "Saudization impact" card in Hiring analyticsthe share of Saudis among active employees (20.6% in the example), recalculated for one more Saudi (21.7%) or one more non-Saudi (20.3%).
- "Screening and AI" tab in the job editorthe establishment's current rate and the rate after the hire.
- Optional "Nationality" column in the employee listwhere you count 14 and 54, as in the example, before entering them.
- "Social insurance" section in Payroll reportseach employee with their nationality, Saudi or non-Saudi, and their share and the employer's share.
- Document expiry alerts60, 30 and 7 days before an iqama expires by default, ahead of the six-month renewal condition.
08Metal ore mining after 2026
Fixed constants tie the Metal ore mining plan to size alone; at 500 employees Low Green stays at 26.44% in all three years.
If a metal ore mining company kept 14 Saudi employees out of 68 until 2028, it would stay in Red, with the Low Green threshold at 23.09% in 2028.
To calculate your entity: the Nitaqat calculator; to compare Metal ore mining with others: Saudization rates by activity.
09Frequently asked questions
50 employees: 22.57% for Low Green and 46.47% for Platinum. 500 employees: 26.44% and 60.29%.
29 Saudi employees for Low Green, 34 for Medium, 46 for High and 63 for Platinum, in 2026.
At 50 employees: 21 of 41 for Platinum (46.47%) and 22 of 41 for Low Green (22.57%).
No. The Metal ore mining constants are the same until 2028, so Low Green at 100 employees is 23.74% and Platinum 50.63% every year.
Cafes and beverage shops (2.24), then Postal activities (2.45), then Non-metallic mining (2.75); smaller means closer to Metal ore mining.
30 employees at the Medium Green minimum (8): replacing 3 reaches 35.07%, or hiring 5 gives 13 of 35 (37.14%).
Yes, at 6 employees: going from 1 to 2 Saudis moves it from Red to High Green.
At 100 employees: 23.74% against 24.26% for Low Green, and 50.63% against 43.21% for Platinum.
A 100-employee entity below 23.74% loses work permit renewal and issuance, visa requests, occupation changes and service transfers into it.
The Medium Green threshold is the line: 26.32% for fifty employees and 31.92% for a thousand.
Put 14 Saudis and 54 expatriates into the calculator under Metal ore mining to reproduce the example, then swap in your own averages.
Between 10 and 1000 employees the Low Green threshold rises by 7.74 points and the Platinum threshold rises by 27.63 points, depending on m for each band.




