01When to use the interior designer job description, and who uses it
A design manager or projects manager writes this description in a design office or a contracting and fit-out company when they need someone who turns a client's request into a concept, drawings and materials that can be built. HR uses it in the contract and in checking the portfolio, and the manager reviews the holder on keeping design stages to their dates, execution matching the design and the client's satisfaction.
It is reopened when the office moves from residential to commercial projects, changing the movement, safety and brand needs; when the designer is asked to supervise execution after only handing over drawings; or when the office begins to give the client indicative prices.
02The interior designer job description
The template groups the interior designer's work under 5 headings, Understanding the client's need, Design and drawings, Materials, suppliers and cost, Follow-up and handover and The client and records, followed by how the job is measured, who suits it and where it is done.
[Company name] Job Description Job title: Interior Designer Department: Design / Projects Reports directly to: [Design Manager / Projects Manager] Work location: [design office, with site visits] Work pattern: [full-time] Issue date: [date] Version: [number] Job summary The interior designer turns the client's need into a concept, drawings and materials that can be built, estimates cost and compares supplier offers, follows conformity of execution to the design with the contractors until handover, and records the client's approval at each stage. Duties and responsibilities 1) Understanding the client's need - Hold a session with the client on use, taste, budget and date. - Inspect the site and take measurements and photographs. - Write the design brief and agree it before starting. 2) Design and drawings - Set the overall concept, mood boards and the layout of the spaces. - Prepare the drawings, elevations and 3D images as the stage requires. - Allow for movement, lighting, ventilation and safety in the layout. 3) Materials, suppliers and cost - Choose materials, furniture and finishes and present alternatives with their prices. - Prepare an initial estimate of quantities with the specialists. - Obtain supplier offers and compare them before recommending. 4) Follow-up and handover - Hand execution drawings to the contractors and explain their details. - Visit the site periodically to check that execution matches the design. - Prepare the snag list at handover and follow it until it is closed. 5) The client and records - Present the design to the client and record comments and changes. - Record the client's approval of each stage in writing. - Keep the project files and final drawings in order. Suggested performance indicators - Design stages kept to their dates. - Number of revision rounds after the concept is approved. - Execution matching the design at handover. - Accuracy of the estimate against actual cost. - Client satisfaction. Qualifications and experience - Bachelor's degree in interior design or interior architecture. - A portfolio that includes projects that were actually built. - At least [__] years in interior design. - Command of 2D and 3D drawing programs [name them]. Skills required - Reading and preparing drawings. - Knowledge of materials, colors and lighting. - Negotiating with suppliers. - Presenting to the client. - Initial estimating of quantities. Working conditions - Office hours, with site visits and client meetings [when needed]. - Pressure close to the handover of stages. Approval [Approver's name and job title] Signature: ________ Date: [date] Job holder acknowledgment I have read the job description of "Interior Designer" above and confirm that I understand its duties. Name: [employee name] Signature: ________ Date: [date]
03The interior designer description, clause by clause
Understanding the need: the brief before the drawing
The designer starts with a session with the client on use, taste, budget and date, inspects the site and measures it, then writes the design brief and gets the client's agreement to it. Many costly changes come from a need nobody asked about.
Design and drawings: the space before the style
The designer lays out the spaces by movement, lighting, ventilation and safety before choosing style and colors, then prepares the drawings, elevations and 3D images as the stage requires. Anything that touches structure and services is reviewed with the site engineer before approval.
Materials and cost: alternatives with prices
The client is shown more than one alternative for each material with the price and supply time of each, and supplier offers are compared before a recommendation. The estimate given to the client is an initial one, and the final quantity schedule is approved by whoever does the take-off.
Follow-up and handover: a visit with a list
The designer visits the site regularly with a list of what to check, explains the drawing details to the contractors and notes differences between what was built and what was designed. At handover a snag list is prepared and followed until closed before final acceptance.
The client and records: written approval for each stage
The client's approval of the concept, then the drawings, then the materials is recorded in writing, so a dispute never goes back past what was agreed. The final drawings and project files are kept in the company folder.
Approval and signature
The interior designer description does not take effect until the approver signs and dates it, and the version number tells the current copy from the last one at every change.
04Interview questions that test the interior designer description
- 01After execution the client objects to a color they approved in writing. What do you do? Go back to the written approval and the approved material sample, offer what can still be changed with its cost, and do not put the cost of a change after documented approval on the company without agreement.
- 02The budget cannot cover a material the client chose. What do you suggest? Offer an alternative with the same effect at a lower price, and an option to postpone part of the project, showing each option's effect on quality and time.
- 03On site you find a difference between the drawing and the real dimension. What do you do? Stop the affected item, inspect and measure again, amend the drawing and have the client approve it again if its effect changes.
- 04How do you present your concept to a client who does not read drawings? With 3D images and real material samples, and a before-and-after comparison from projects that were built.
05A filled-in example: an interior designer for a design and fit-out office in Riyadh
A design and fit-out office in Riyadh hires a non-Saudi interior designer reporting to the design manager, for villa and commercial office projects. The company wrote that the client's approval of each stage is recorded in writing, that the designer visits each project site weekly during execution, and that the final quantity schedule is prepared by the projects department. The single overtime hour in the example only shows the hourly rate.
| Field | In the example |
|---|---|
| Company | A design and fit-out office serving residential and commercial projects |
| City | Riyadh |
| Work period | Morning, 8:00 am to 5:00 pm with an hour's break |
| Start date | 2027-01-03 |
| Nationality | Non-Saudi |
| Basic salary | SAR 8,000.00 |
| Housing allowance | SAR 2,000.00 |
| Transport allowance | SAR 800.00 |
| Total monthly salary | SAR 10,800.00 |
Entering these interior designer numbers in the overtime calculator, the end-of-service calculator, the GOSI calculator and the leave calculator returns the same results:
| Calculation | Result | Basis |
|---|---|---|
| End of probation (90 days) | 2027-04-02 | the start date counts as day one |
| Actual hourly wage | SAR 45.00 | (basic + allowances) ÷ 30 ÷ 8 hours |
| Overtime hourly rate | SAR 61.67 | actual hourly wage + 50% of the basic hourly wage |
| Pay for 1 overtime hour | SAR 61.67 | overtime rate × hours |
| Employee GOSI share per month | SAR 0.00 | nothing is deducted from a non-Saudi employee |
| Employer GOSI share per month | SAR 200.00 | 2% of the contributory wage |
| End-of-service award if the contract ends at term after two years | SAR 10,800.00 | half a month's wage per year for the first five years, on the total of SAR 10,800.00 to 2029-01-02 |
| Annual leave earned by the end of probation | 5.18 days | 21 days per year of service, pro rata |
06Hard cases and common mistakes in a interior designer description
A client changes the concept after execution has started
The designer sets out the effect of the change on time and cost in writing and carries it out after signed approval. The description makes a post-execution change a change request, not a spoken amendment.
A material is approved and then cannot be supplied
The designer tells the client at once and offers a close alternative with its sample and price, does not substitute it without approval, and records what was done.
A project on a site that is hard to reach often
The designer agrees fixed visits and relies on photos and video from the site engineer between them, and writes the limits of supervision precisely in the description.
Designing for an existing project begun by a previous designer
The designer asks for the original drawings and inspects the site as it stands rather than building on photos alone, and records what has changed from the original.
Common mistake: Confusing concept with execution
The designer sets the concept and the details and follows conformity; execution belongs to the contractor under the site engineer. Do not make the role answer for what someone else builds.
Common mistake: Overlooking a portfolio of built work
A portfolio of concepts alone does not show that its owner has seen a project through to handover.
07Steps to adapt the interior designer description to your company
- 1
State the type of projects
Residential, offices, restaurants or hotels? Movement, safety and brand needs differ between them, and so do the qualifications asked for.
- 2
Ask for a portfolio of built projects
Tell a concept on paper from a project the designer saw through to handover, and ask what their part was in each one.
- 3
Define the role in supervision
Coordinating visits or full supervision of the contractor? The answer changes the size of the job and what the holder answers for.
- 4
Name the drawing programs
List what the company actually uses, to avoid a candidate who is strong in a different program.
- 5
Say who prepares the final quantity schedule
The designer or the projects department? The designer usually gives an initial estimate and the final take-off belongs to a specialist.
08Interior designer description checklist before approval
6 items
09Frequently asked questions
The title varies between companies, so write the work expected: concept, execution drawings or supervision, rather than relying on the name.
Yes, adjust the designer's relationship with the site engineer, the projects department and procurement.
Make it a plus, and if the project contract requires it of whoever signs the drawings, write it as a requirement according to your contract.
Write the program the company uses and what you will accept in its place; do not limit candidates to one name without a reason.
The designer gives estimates and supplier offers, and the final price is approved by whoever prices in the company.
Write who signs according to your company policy and the project contract, and do not assume it is always the designer.
Ask for it if most of your projects are of one type, such as hospitality, since the requirements differ between types.
Write the expected rhythm of visits rather than a fixed number, since it changes with the size and stage of the project.
